Site Safety and Installation Works

Installation of; debris netting; viaduct protection works; walkway installation and site safety surveys.

  • Civil and Construction, Labour Supply, and Site Safety and Installation Works

The works were carried out over a long weekend possession, requiring back to back shift co-ordination and organisation. With the strict deadline of works, it is important to ensure that the sufficient planning and process management, was carried out onto the site. Due to the sensitivity and high profile location, extra steps to ensure noise and material pollution was recorded and kept at a minimal. Requiring, the installation of 150m of soundproofing with sufficient volume monitoring.

Read More
  • Civil and Construction and Site Safety and Installation Works

Reactive works following strikes and/or reported issues.

The team mobilise and set up scaffold towers to inspect the bridge structure then carry out any repairs agreed with the client.

Read More
  • Civil and Construction, Labour Supply, and Site Safety and Installation Works

Bank works including retaining wall and excavation for REB installation. Area of embankment was excavated and a new compacted base of MOT was installed ready for the main works. Logistics at this site were challenging as it was in a residential area of Wimbledon and the volume of materials being removed from and delivered to site required careful management to ensure that the area was not congested with queuing vehicles.

Read More
  • Civil and Construction and Site Safety and Installation Works

Orion were contracted to support Murphy’s with supply of labour and engineering staff for these major works. Support works were carried out over several months with the main works utilizing a Christmas blockade.

Read More
  • Site Safety and Installation Works

GRP Handrail protecting a bridge parapet had become damaged and sections were missing. The team removed the existing handrail, repaired and replaced as necessary then reinstalled it.

Read More
  • Site Safety and Installation Works

We have recently completed a high profile temporary fencing project for Colas rail based in Hampshire. We were instructed to erect temporary fencing along the 180M viaduct to protect the public below from potentially falling debris during their core renewal track.

Read More
  • Site Safety and Installation Works

Orion were asked to inspect the floor of a new sub station building by SSE and advise on a repair method.

Read More
  • Site Safety and Installation Works

Excavation of site, installation of new retaining wall system. This was then followed by installation of formwork with a reinforced concrete base installation for new REB. Our engineers set the site out and our team of concrete workers and steel fixers installed the large concrete base as per the clients design specifications.

Read More
  • Civil and Construction and Site Safety and Installation Works

Access to inspect was limited so a MEWP was utilsed to allow a thorough inspection minor brickwork repairs were then carried out as required.

Read More
  • Civil and Construction and Site Safety and Installation Works

Scope: RRAP Installation at five sites in Kent and London. Orion were contracted to remove existing non standard RRAPS at several locations and replace with new larger compliant Strail versions along with concrete infills and ramps.

Read More