Labour Supply

Providing long-term and reactive, labour provision for the rail industry. Fulfilling both white and blue colour roles across the industry.

  • Facilities Management, Labour Supply, News Stories, and On Site Transport Services

Orion provide commercial property, facilities management at Juniper Crescent for the past two years and continuing. Providing the labour, and supervision of; building and window cleaning; reception staff; minibus provision; waste management (weekly); pest control visits; fire extinguishers and annual maintenance; fire risk assessments; annual maintenance of lighting and emergency lighting; handyman services and the provision of first aid points.

Read More
  • Civil and Construction and Labour Supply

Orion was tasked with the adjustment of the existing platform, to the new modified design as presented by the client. This is done by gauging the existing platform and raising/lowering it vertically/horizontally, to match the proposed design.

Read More
  • Civil and Construction, Labour Supply, and Site Safety and Installation Works

The works were carried out over a long weekend possession, requiring back to back shift co-ordination and organisation. With the strict deadline of works, it is important to ensure that the sufficient planning and process management, was carried out onto the site. Due to the sensitivity and high profile location, extra steps to ensure noise and material pollution was recorded and kept at a minimal. Requiring, the installation of 150m of soundproofing with sufficient volume monitoring.

Read More
  • Civil and Construction and Labour Supply

This was a very prestigious job needed for Colas which involved many different areas of expertise for our Orion team. We had concurrent jobs running at the same location which involved heavy planning and pin point accuracy on execution to make sure the strict times frames were adhered to.

Read More
  • Facilities Management, Labour Supply, and Waste Disposal and De-vegetation

Removal of old advertising signage from underground tunnels and repainting of the tunnel walls ready for new installations.

Read More
  • Civil and Construction, Labour Supply, and Site Safety and Installation Works

Bank works including retaining wall and excavation for REB installation. Area of embankment was excavated and a new compacted base of MOT was installed ready for the main works. Logistics at this site were challenging as it was in a residential area of Wimbledon and the volume of materials being removed from and delivered to site required careful management to ensure that the area was not congested with queuing vehicles.

Read More
  • Labour Supply and Waste Disposal and De-vegetation

A redundant building at Mornington Crescent was to be re-utilised and brought back into service as a drivers access point. The building had sat redundant for many years and had been broken into and vandalized as well as having animal infestations.

Read More