Battersea

Client

COLAS Rail

Services
  • Civils
  • UKPN Manholes
  • Ducting
  • Reinstate concrete
  • Reinstate tarmac road

PROJECT INTRODUCTION

Orion Rail are working with Colas and Network Rail to connect a new local power supply from UKPN to a new points heating installation and substation at Battersea .
Orion’s works are to install new cable turning chambers and buried duct route through a third parties land and their access gate to allow the cabling to connect from the public highway to the Network Rail interface point.
These works involve conforming to both UKPN and Network Rail standards as well as working closely with the third party to ensure that at all times during the works we maintain access to their property.